KW Construction repairs and replaces NYC sidewalks to eliminate hazards, stop water intrusion, and meet DOT/Local Law requirements. We handle violations from inspection to sign-off, coordinate permits and traffic control, and stage work to maintain safe pedestrian access around occupied buildings.
From single flag replacements to full frontage reconstructions, we correct settlement, heave, and tree-root damage; upgrade sub-base and drainage; and finish surfaces to clean, even tolerances. Our crews work quickly and neatly, minimizing dust, noise, and disruption.
What this includes
Do you handle DOT permits and inspections?
Yes. We file permits, schedule inspections, and close out violations through to sign-off.
Can you work around trees without harming roots?
We use root bridges, adjustable bases, and layout tweaks to protect trees while restoring a level walking surface.
How long before the sidewalk can be used?
Most pours can accept light foot traffic within 24–48 hours, with full cure in ~7 days (weather dependent).
What causes sidewalks to crack again?
Poor sub-base, inadequate joints, drainage issues, or root pressure. We address these in the design so repairs last.